Structive begin works on N22 Road Development project
The Structive team have recently commenced work on Structure 28 on the N22 road development which is the Sullane River Bridge.
This structure is a 100mtr long bridge deck over the Sullane river.
It’s construction will feature
2 piled abutments with pattern formwork finish
1 piled central pier with 5 circular columns and cross head beam.
Below you can see an aerial shot of the bridge site on the new motorway route with the central piers under construction at the rivers edge.