Recent addition: Mecalac Cabbed Dumpers

At Structive we place a huge emphasis on safety!! These 2 Mecalac 6 MDX cabbed dumpers are designed completely with SAFETY in mind

Their main attributes are
-Perkins stage V emission standards compliant
-“Butterfly” side doors create a wide access space to access the cab.
-Excellent direct field of vision complemented by a forward facing camera and hazard detection while also decreasing the chance of coming in contact with individuals or obstacles.
-An isolated cab to limit noise and vibrations
-The 6MDX meets and exceeds ISO5006 standard. (This is the earth-moving machinery operators field of view ISO standard)

Latest News, Careers & Projects

Compound Perimeter Fencing

2023-01-21

One of the numerous Compounds constructed by our Utilities Teams complete with Palisade Perimeter Fencing

Telecoms Tower Erection

2023-01-21

One of the numerous Telecoms Towers Erected by our Utilities Teams

Services Ducting and Chambers

2023-01-21

One of the numerous Telecoms compounds constructed by our Utilities Teams

Telecoms Compound Construction and Tower Erection

2023-01-21

One of the numerous compounds constructed by our Utilities Teams

Compound Access Road Construction

2023-01-21

One of the numerous Access Roads constructed by our Utilities Teams

Telecommunications Compound – Palisade Perimeter Fencing

2023-01-21

One of the numerous Telecoms compounds constructed by our Utilities Teams

culvert 39 n22 macroom bypass

2021-06-01

CULVERT CONSTRCUTION – N22 MACROOM TO BALLYVOURNEY ROAD DEVELOPMENT – JONS/JCL JV Our team recently poured 120mtr RC Roof slab to culvert 39 on the Macroom bypass road development

Structure 207 ISLANDEADY ROAD OVERBRIDGE

2021-06-01

OVERBRIDGE CONSTRCUTION – N5 WESTPORT TO TURLOUGH ROAD DEVELOPMENT – WILLS BROS/BAM JV Our team recently poured 100mtr deck to Structure 207 on the Islandeady Road outside Castlebar. This is 1 of 6 bridges under construction by our team on […]

Structure 305 ballinrobe road overbridge

2021-06-01

OVERBRIDGE CONSTRCUTION – N5 WESTPORT TO TURLOUGH ROAD DEVELOPMENT – WILLS BROS/BAM JV Our team recently poured 220mtr deck to Structure 305 on the Ballinrobe Road outside Castlebar. This is 1 of 6 bridges under construction by our team on […]

bebo ARCHED flood relief CULVERTS

2021-03-14

ARCHED CULVERT CONSTRUCTION – MACROOM BYPASS – JONS/JCL JV In close proximity to Structure 28, the sullane river bridge, Structive teams are constructing a number of flood relief arched culverts on either side of the River Sullane

Structive Logo
About us

Structive Civil Engineering is a highly skilled engineering firm that works closely with clients to ensure that each and every project is delivered to the highest engineering standards. The latest engineering methodologies are utilised to develop the most cost-effective solutions.

Quick Links​
  • Home

  • About

  • Services

  • Projects

  • Contact

Connect
Scroll to Top