OVERBRIDGE CONSTRCUTION – N5 WESTPORT TO TURLOUGH ROAD DEVELOPMENT – WILLS BROS/BAM JV Our team recently poured 100mtr deck to Structure 207 on the Islandeady Road outside Castlebar. This is 1 of 6 bridges under construction by our team on […]
OVERBRIDGE CONSTRCUTION – N5 WESTPORT TO TURLOUGH ROAD DEVELOPMENT – WILLS BROS/BAM JV Our team recently poured 220mtr deck to Structure 305 on the Ballinrobe Road outside Castlebar. This is 1 of 6 bridges under construction by our team on […]
ARCHED CULVERT CONSTRUCTION – MACROOM BYPASS – JONS/JCL JV In close proximity to Structure 28, the sullane river bridge, Structive teams are constructing a number of flood relief arched culverts on either side of the River Sullane
BRIDGE WORKS ON THE N5 BYPASS FOR WILLS BROS – BAM JV Structive are currently working on structures 207 and 305, 2nr Overbridges on this 22km road development Delighted with progress so far despite the difficulties of managing the work […]
Precast beams for Sullane RiverBridge on N22 Macroom to Ballyvourney Bypass Last week wrapped up with the install of the first of 14 150tonne W19 beams from banagher concrete between the east abutment and centre piers of the Sullane River […]
Structive begin works on N22 Road Development project The Structive team have recently commenced work on Structure 28 on the N22 road development which is the Sullane River Bridge. This structure is a 100mtr long bridge deck over the Sullane […]
Structive begin works on N22 Road Development project Recently Structive Civil Engineering started works on structures on the N22 Baile Bhuirne to Macroom road development project in conjunction with main contractors Jons/JCL JV. The project includes for the construction of […]
Butterfly Suite Extension This week the Structive team started works in Temple St alongside main contractor Carey Building Contractors. This project is the construction of the new extension to the childrens hospital. The scope of works includes, RC pad construction […]
At Structive we place a huge emphasis on safety!! These 2 Mecalac 6 MDX cabbed dumpers are designed completely with SAFETY in mind Their main attributes are-Perkins stage V emission standards compliant-“Butterfly” side doors create a wide access space to […]
We take pride in our range of plant and equipment. We operate a modern fleet of specialist plant and equipment specific to Civils work &demolition.Kobelco develop products that raise productivity. High productivity has long been associated to low energy consumption, […]