N5 WESTPORT TO CASTLEBAR BYPASS

BRIDGE WORKS ON THE N5 BYPASS FOR WILLS BROS – BAM JV

Structive are currently working on structures 207 and 305, 2nr Overbridges on this 22km road development

Delighted with progress so far despite the difficulties of managing the work and keeping everybody safe during these times

Latest News, Careers & Projects

Project: Mater Hospital Laboratory, Dublin

2020-05-05
Mater Hospital Diamond Cutter

Existing services and plant decommissioning, soft stripping, temporary works, controlled robotic demolition of load-bearing and non-load bearing structures, wire-sawing existing RC stairs and landings, saw-cutting RC slabs, and diamond drilling to enable new drainage run installations. This particular work required […]

Project: 4Site Networks, RC bases

2019-11-08
Network Main Pylon

Multiple Sites Nationwide All setting out and measuring using GPS Site clearance (urban, rural and Coillte sites) Bulk excavations Construction of haul and permanent roadways with associated drainage and crossings Construction of various size RC bases, including holding down bolts […]

Structive Logo
About us

Structive Civil Engineering is a highly skilled engineering firm that works closely with clients to ensure that each and every project is delivered to the highest engineering standards. The latest engineering methodologies are utilised to develop the most cost-effective solutions.

Connect
Scroll to Top