Existing services and plant decommissioning, soft stripping, temporary works, controlled robotic demolition of load-bearing and non-load bearing structures, wire-sawing existing RC stairs and landings, saw-cutting RC slabs, and diamond drilling to enable new drainage run installations.
This particular work required noise, dust and vibration pollution control—which is critical in a hospital environment—and the use of robotic demolition plan.