Project: Mater Hospital Laboratory, Dublin

Existing services and plant decommissioning, soft stripping, temporary works, controlled robotic demolition of load-bearing and non-load bearing structures, wire-sawing existing RC stairs and landings, saw-cutting RC slabs, and diamond drilling to enable new drainage run installations.

This particular work required noise, dust and vibration pollution control—which is critical in a hospital environment—and the use of robotic demolition plan.

Latest News, Careers & Projects

Structure 305 ballinrobe road overbridge

2021-06-01

OVERBRIDGE CONSTRCUTION – N5 WESTPORT TO TURLOUGH ROAD DEVELOPMENT – WILLS BROS/BAM JV Our team recently poured 220mtr deck to Structure 305 on the Ballinrobe Road outside Castlebar. This is 1 of 6 bridges under construction by our team on […]

bebo ARCHED flood relief CULVERTS

2021-03-14

ARCHED CULVERT CONSTRUCTION – MACROOM BYPASS – JONS/JCL JV In close proximity to Structure 28, the sullane river bridge, Structive teams are constructing a number of flood relief arched culverts on either side of the River Sullane

N5 WESTPORT TO CASTLEBAR BYPASS

2021-01-31

BRIDGE WORKS ON THE N5 BYPASS FOR WILLS BROS – BAM JV Structive are currently working on structures 207 and 305, 2nr Overbridges on this 22km road development Delighted with progress so far despite the difficulties of managing the work […]

150 tonne precast beams

2021-01-31

Precast beams for Sullane RiverBridge on N22 Macroom to Ballyvourney Bypass Last week wrapped up with the install of the first of 14 150tonne W19 beams from banagher concrete between the east abutment and centre piers of the Sullane River […]

N22 SULLANE RIVER BRIDGE

2020-12-07

Structive begin works on N22 Road Development project The Structive team have recently commenced work on Structure 28 on the N22 road development which is the Sullane River Bridge. This structure is a 100mtr long bridge deck over the Sullane […]

N22 BAILE BHUIRNE TO MACROOM ROAD DEVELOPMENT

2020-11-11

Structive begin works on N22 Road Development project Recently Structive Civil Engineering started works on structures on the N22 Baile Bhuirne to Macroom road development project in conjunction with main contractors Jons/JCL JV. The project includes for the construction of […]

Temple St Childrens Hospital dublin

2020-10-15

Butterfly Suite Extension This week the Structive team started works in Temple St alongside main contractor Carey Building Contractors. This project is the construction of the new extension to the childrens hospital. The scope of works includes, RC pad construction […]

Recent addition: Mecalac Cabbed Dumpers

2020-09-07

At Structive we place a huge emphasis on safety!! These 2 Mecalac 6 MDX cabbed dumpers are designed completely with SAFETY in mind Their main attributes are-Perkins stage V emission standards compliant-“Butterfly” side doors create a wide access space to […]

Recent addition: Kobelcos

2020-09-07

We take pride in our range of plant and equipment. We operate a modern fleet of specialist plant and equipment specific to Civils work &demolition.Kobelco develop products that raise productivity. High productivity has long been associated to low energy consumption, […]

Latest news: New website Build

2020-09-07

The team at Structive are actively developing the company forward. We recently updated our website to provide insights and showcase capabilities. Over the upcoming days, weeks, months and year we have developed our website to be information driven. We plan […]

Structive Logo
About us

Structive Civil Engineering is a highly skilled engineering firm that works closely with clients to ensure that each and every project is delivered to the highest engineering standards. The latest engineering methodologies are utilised to develop the most cost-effective solutions.

Connect
Scroll to Top